Concrete slab
A reinforced slab with a tight level tolerance. Best for permanent siting, weak topsoil and high snow-load regions. Needs drainage planning and curing time — schedule it well before delivery.
Buyer guide
A QHOME house arrives as a finished module — but it cannot stand directly on the ground. This guide explains which bases work, how to choose one, and exactly what to prepare on your site before the truck arrives.

A reinforced slab with a tight level tolerance. Best for permanent siting, weak topsoil and high snow-load regions. Needs drainage planning and curing time — schedule it well before delivery.
Steel piles screwed into the ground and cut to a level plane. Best for slopes, sensitive landscapes and fast or seasonal siting. No excavation, installable most of the year.
Cast or precast supports under the module's load points. A cost-effective option on stable soils. Requires accurate setting-out to match the support scheme.
A perimeter concrete strip, used where local rules require it or where a crawl space is wanted.
The support scheme of the model: load points, loads and the required level plane. Technical requirements for the base. Experience from comparable projects in your region.
The base itself, to the support scheme and local code. Site drainage. Utility stubs at the model's connection points. Access and a level working zone for the crane.
For simple screw-pile sitings on known ground a survey is often not required — confirm locally.
No. A gravel pad alone does not guarantee a stable, level, ventilated support plane. It can be part of the build-up under a slab or piers, but not the base itself.
The support scheme for your model defines the tolerance — typically within a few millimetres across the support points.
Yes. Houses on screw piles or point supports are relocatable; the new site needs its own prepared base.
The base is built by a local contractor. QHOME provides the support scheme and technical requirements; in some regions we can recommend partners — ask when requesting a quote.
Before delivery. Production takes about 2 weeks and delivery about 1 week, so the base should be planned in parallel with the order.
Technical information verified:
Pick a model, compare packages in the calculator and send us your site details — we will check foundation, delivery, utilities and regional fit for you.